Sunsynk 25 kW three-phase HV hybrid inverter

Technology catalogue · Inverters, chargers and control

Sunsynk 25 kW three-phase HV hybrid inverter

A three-phase 25 kW high-voltage hybrid inverter for commercial solar and battery energy-storage projects.

Available to enquire — configuration and availability confirmed individually

Manufacturer
Sunsynk
Product code
10000107
Category
Inverters, chargers and control

Technical selection guide

Where Sunsynk 25 kW three-phase HV hybrid inverter may fit

A three-phase 25 kW high-voltage hybrid inverter for commercial solar and battery energy-storage projects.

We treat the catalogue model as the start of engineering, not as a pre-approved design. For Sunsynk product code 10000107, we confirm the currently supplied hardware revision, certificates, firmware, interfaces, warranty path and local service conditions before it enters a bill of materials.

Review areaWhat we verifyWhy it matters
Electrical designVoltage window, continuous and peak power, protection and conductor sizingPrevents incompatible equipment and nuisance trips
Control and dataBMS/EMS protocol, metering, export limits, remote access and firmwareKeeps the system controllable, observable and supportable
Site integrationGrid conditions, backup loads, environment, fire strategy and accessConnects product capability to the real operating scenario
LifecycleWarranty assumptions, cycles, spares, commissioning and service responseProtects availability and whole-life economics

What the project-specific offer contains

  • confirmed model, revision and locally applicable documentation,
  • compatibility statement for the proposed system architecture,
  • required protection, monitoring and communication interfaces,
  • commissioning scope, acceptance criteria and service responsibilities.

Image source: Sunsynk – Hybrid Inverter 25 kW 3P HV, checked 2026-09-02. The pictured model corresponds to the product page designation.

We recommend this technology only when measured data and the complete system design show that it is the right technical and commercial fit.

First step

Data first. Technology second.

Describe the facility, operating problem and required outcome. We will identify the useful input data and propose an appropriate review scope.